Past Communications
Smart Growth 41 Update 9/23/26
Top Lines
SCDES may have issued a major state permit for the Highway 41 project, but we are not out of road and the fight is not over. While this decision moves the permitting process one step closer to a close, it does not mean the project is fully authorized or that a final decision has been made, because a decision from the U.S. Army Corps of Engineers is still outstanding. Smart Growth 41 is reviewing the agencies’ actions and the options available to us if either the state or federal process fails to address the project’s serious and well-documented impacts.
Vote “No” on the Charleston County Transportation Sales Tax. The County has not shown through its management of the Highway 41 project that it will be a good steward of the additional $4.25 billion in taxpayer dollars they are requesting to raise through this referendum.Highway 41 Permitting Update: SCDES Permits Issued, but Project Not Approved
Many of you have heard that the South Carolina Department of Environmental Services (SCDES) has issued a major state permit for the Highway 41 project.While this moves the permitting process one step closer to a close, it does not mean the project is fully authorized or that a final decision has been made.The permit authorizes impacts to wetlands and critical areas associated with the widening of Highway 41 and construction of the Laurel Hill Parkway. However, the permit itself makes clear that the County must still obtain authorization from the U.S. Army Corps of Engineers before proceeding with work requiring federal approval.Now that SCDES has acted, the Corps could move quickly.Smart Growth 41 has contacted the Corps to ask:
Whether its permit has been issued, offered to the County, or is being prepared What issues remain unresolved How the Corps is addressing the extensive public comments concerning flooding, drainage, wetlands, mitigation, alternatives, water quality, habitat, fisheries, and cumulative impactsWe are also reviewing the SCDES permit, its special conditions, and the broader agency record.Issuing a permit does not, by itself, demonstrate how the agency evaluated or resolved the substantive concerns raised by Smart Growth 41 and members of the community. If those issues were fully considered, the agency record should show it. If not, we have recourse.The permit package also contains conditions related to erosion, sediment control, and stormwater management. However, it does not appear on its face to be a separate construction-stormwater authorization.This was the focus of the most recent public hearing, and we are seeking clarification about whether that approval has been issued separately or remains pending.The Bottom Line: We are not out of road.
The permitting process may be nearing its conclusion, but the scrutiny of these decisions is not.A permit is only as sound as the analysis and record supporting it. Smart Growth 41 is reviewing the agencies’ actions and the options available to us if either the state or federal process fails to address the project’s serious and well-documented impacts.
Vote “No” on the Transportation Sales Tax
This election season, Charleston County residents will be asked to consider a proposed 25-year extension of the County’s half-cent transportation sales tax.Smart Growth 41 encourages you to vote NO.Approving these ballot questions would, in effect, allow for a continuation of the funding stream that has supported projects such as the failed “Road to Compromise” design for Highway 41 expansion. Smart Growth 41 continues to oppose this plan.For years, residents have offered alternatives that would improve Highway 41 without constructing the Laurel Hill Parkway through parkland and wetlands.Thousands of comments have been submitted, and residents have attended hearings, contacted elected officials, and repeatedly asked the County to reconsider its approach.What the County’s Own Public Input Shows
The strength of that opposition is documented in Charleston County’s own 2026 public-input report regarding the transportation sales tax extension.Removing or redesigning the Highway 41 plan and opposing the Laurel Hill Parkway was the second-most frequently raised theme in response to both open-ended questions in the report, accounting for approximately 18% of comments to each.The County reported that the overwhelming majority of Highway 41 comments opposed the proposed routing and that many residents tied their support for a new transportation sales tax to withdrawal of the plan.The County claims that it released this survey and engaged in a broad-based public, municipal, and stakeholder engagement process to identify transportation priorities across the county and be more responsive to public input.But the County’s unwillingness to develop a true solution for Highway 41 in response to these comments shows that it is still not listening.Until Charleston County Council abandons this road design in favor of something better, we cannot be confident that it will be a good steward of the additional $4.25 billion in taxpayer dollars they are requesting to raise through this referendum or will be any more responsive to public input regarding the new transportation projects this transportation sales tax would fund.While this is not the case for every Council member, the fact remains that the majority of Council has done nothing to dispel our concerns that these additional funds will be used to push similarly ill-conceived road projects.Furthermore, Charleston County residents already face some of the highest sales tax rates in the country. According to analysis from the Tax Foundation, the 9% sales tax rate Charleston County residents pay is one of the highest sales tax burdens in the country.Make Your Voice Heard
Early voting in South Carolina starts Monday, October 19 and runs through Saturday, October 31.Smart Growth 41 encourages supporters to vote NO on Charleston County Special Sales and Use Tax Questions 1 and 2.For voting dates, times, locations, a sample ballot, and voter registration information, visit: www.SCVotes.gov
SAMPLE BALLOT
Dear neighbors,
On Tuesday night, Mount Pleasant Town Council voted 5–4 against withholding municipal consent for Charleston County's current Highway 41 plan.
We are deeply disappointed by the outcome. But Tuesday's vote did not approve the project, issue its environmental permits, or end the public's opportunity to demand a better solution. In short, the fight is not over.
One avenue may have closed Tuesday night, but the next phase is already underway.
A Quick State of Play for the Current Highway 41 Fight
Despite the Mount Pleasant vote, the Highway 41 project is not a done deal. Major state and federal permits remain pending.
The next public hearing begins at 6:00 p.m. on Wednesday, July 22, at the Wando High School Auditorium (1000 Warrior Way, Mount Pleasant, SC 29466).
Written comments remain open through August 1, and Smart Growth 41 has created a form to help residents submit them through our Action Center.
What happened Tuesday night
First, we want to thank every resident who showed up, spoke, submitted one of the more than 700 comments Town Council received, and encouraged neighbors to get involved.
Hundreds of residents packed Mount Pleasant Town Hall. The Council chambers filled beyond capacity, an overflow room had to be opened, and residents provided nearly two and a half hours of public comment. Councilmembers and longtime meeting attendees remarked that they had never seen public participation on that scale.
That turnout mattered.
We may not have won the vote, but the community delivered an unmistakable message: opposition to the County's current Highway 41 design is broad, organized, informed, and not going away. Residents will continue to speak up, demand accountability, and fight for a better solution.
We are grateful to Councilmembers Daniel Brownstein, John Iacofano, Laura Hyatt, and Jake Rambo, who voted to withhold municipal consent and push Charleston County toward a better Highway 41 plan.
We are deeply disappointed that Mayor Will Haynie and Councilmembers Mike Tinkey, Kathryn Whitaker, and Alex Crosby did not keep the promises they made to residents to oppose a road through Laurel Hill County Park. We are also disappointed that Councilmember Howard Chapman voted once again to advance this failed plan.
Residents will remember this vote. More importantly, the elected officials who supported the County's plan should understand that Tuesday night did not end the public debate, nor did it resolve the underlying environmental, flooding, drainage, and community concerns.
Tuesday's vote was never the project's final hurdle
From the beginning, there have been two broad avenues through which the Highway 41 design could be reconsidered: the political process and the permitting process.
The municipal consent vote was an important opportunity to bring Charleston County back to the table, but it was never the project's only remaining hurdle or Smart Growth 41's only path forward.
For six years, we have also worked through the state and federal permitting processes, building a detailed public record and identifying the environmental and technical flaws that agencies must consider before this project can lawfully proceed.
That work now returns to the forefront.
Despite claims that the project will imminently move forward, the principal permits needed to build it have not been issued. The South Carolina Department of Environmental Services is still considering state approvals, and the U.S. Army Corps of Engineers has not issued the federal Section 404 permit required for impacts to federally protected wetlands and waters.
No final decision has been made on those central approvals.
The project still must withstand serious review involving wetlands, flooding, drainage, water quality, construction runoff, coastal resources, historic resources, alternatives, and the broader public interest.
The next opportunity: The July 22 DES hearing
The South Carolina Department of Environmental Services (DES) will hold its next Highway 41 public meeting and hearing:
Wednesday, July 22, 2026
6:00 p.m.
Wando High School Auditorium
1000 Warrior Way
Mount Pleasant, SC 29466
Please attend if you can.
This hearing is different from earlier proceedings residents may have attended. It focuses primarily on Charleston County's application for a construction stormwater permit and the associated coastal review.
In plain language, DES is being asked whether the County has developed an adequate plan to control erosion, sediment, flooding risks, and other pollution during the years of major construction it will take to build the Laurel Hill Parkway and widen Highway 41.
Runoff from the project would flow toward sensitive creeks, wetlands, shellfish-harvesting waters, and other coastal resources. These are direct questions about whether construction runoff and pollution could affect nearby neighborhoods, wetlands, creeks, and coastal resources.
This hearing is important, but it is not final approval of the entire Highway 41 project. It is also not an Army Corps hearing and it will not decide whether the County may fill federally protected wetlands. The Army Corps Section 404 review remains one of the project's most important outstanding approvals.
How to make your comments effective
Residents do not need to be engineers or environmental experts to participate.
The most useful comments connect your personal knowledge and local experience to the questions DES is reviewing, including:
- Flooding or drainage problems you have personally observed.
- Concerns about sediment, runoff, wetlands, creeks, or nearby water quality.
- Questions about whether construction controls will protect homes, neighborhoods, and natural resources during construction.
- Concerns about the scale of clearing, grading, road construction, and stormwater discharge.
- Concerns about who will inspect the project, maintain the controls, correct failures, and remain accountable throughout construction.
Comments tied to these permitting issues are generally more useful than simply restating opposition to the overall project.
Smart Growth 41 has created a pre-populated form that residents can review, personalize, and submit through our Action Center.
Written comments remain open through August 1, 2026.
Where we go from here
Tuesday night was deeply disappointing. Residents showed up in extraordinary numbers, made a compelling case, and asked their elected officials to stand by the commitments they had made and insist on a better plan.
Five members of Mount Pleasant Town Council chose not to do so.
But that vote is not the final say. It did not issue the project's permits. It did not resolve its environmental deficiencies. It did not erase the technical concerns residents have raised for years. And it did not end Smart Growth 41's work.
Where we go from here is clear.
We attend the July 22 hearing. We submit focused written comments. We continue demanding the technical information, enforceable protections, and public accountability this project requires. And we remain active through every state and federal review that stands between Charleston County's current design and construction.
Tuesday night proved the strength of this movement.
Now we carry that strength into the next phase.
Smart Growth 41
Update: July 13th, 2026:
The next 4 days are critical.
30 second read of what you need to know and what to do.
Or Click Here to Watch a 2 minute Video
Town Council is voting on municipal consent for the current Highway 41 design on Tuesday, July 14th. Confusion remains over what that vote actually means.
A vote to remove consent opens the door for a better solution.
While some claim withholding consent would automatically end the project and eliminate funding, elected officials say otherwise and want to set the record straight.
With clarification from SCDOT Secretary Justin Powell, Representative Kathy Landing, Senator Larry Grooms, and Councilmember John Iacofano all point to the same conclusion: redesigning the Highway 41 project does not make the funding disappear.
This vote is not about whether Highway 41 should be improved, but whether Charleston County's current design is the best solution long-term.
What you need to do:
-
Attend the Town Council meeting on Tuesday, July 14 at 6:00 p.m.
-
Submit your comments through the button below before this critical vote. Multiple comments are encouraged.
Here’s The Full Story and Details:
Over the last several days, there has been a lot of confusion about Highway 41, municipal consent, and what may or may not happen if Mount Pleasant Town Council votes to withhold consent for Charleston County’s current Highway 41 plan.
We want to help set the record straight.
Smart Growth 41 supports needed improvements to Highway 41. This has never been about doing nothing. It has always been about whether Charleston County’s current design is the right long-term solution for local communities and everyone who depends on this corridor.
Many residents believe that what the County is currently proposing is not a true solution to the long-term traffic challenges facing Highway 41. The current plan still cuts a new unnecessary roadway through Laurel Hill County Park, adds impacts to surrounding neighborhoods, and leaves serious questions about whether the design is the best long-term investment for Highway 41.
Now residents are being told by some elected officials and in the media that Mount Pleasant has no real choice: approve the County’s current design exactly as presented or lose everything and suffer financial penalties.
We do not believe that is an accurate or complete picture.
First, there has been confusion about the new SCDOT modernization bill, S.831.
S.831 was a broad Department of Transportation modernization bill that addressed many different issues related to transportation governance, project delivery, funding, procurement, tolling for new "express lanes," and the structure of SCDOT. Local legislators who voted for the overall bill voted for that broader modernization effort. Their vote should not be interpreted as support for using one provision of that bill to threaten Mount Pleasant with financial penalties for exercising municipal consent on Highway 41. Importantly, the Section of the new Act regarding municipal consent does not even take effect until July 1, 2027. It has no bearing whatsoever on this current Highway 41 project.
That distinction matters.
Representative Kathy Landing – who represents the Highway 41 corridor and has been specifically mentioned in recent discussions about this bill – spoke today with SCDOT Secretary Justin Powell to clarify how this legislation relates to Highway 41. Based on what has been relayed to us, Secretary Powell understood his prior discussion about municipal consent with Mayor Haynie to involve a hypothetical example of how the law could apply to an SCDOT project. Highway 41, however, is a county-led project funded through the Charleston County transportation sales tax along with the State Infrastructure Bank, which is a completely separate entity from SCDOT.
Furthermore, Highway 41 is not an SCDOT project. That means they do not believe the agency has any purview over the project and the claim that S.831 would automatically expose Mount Pleasant to a multimillion-dollar penalty if Town Council withholds municipal consent does not apply here.
Even if this was an SCDOT project (which it is NOT), our understanding is that SCDOT would view a locality’s refusal to consent as a rejection of that project and move on. There is no basis for the claim that SCDOT would seek to recover millions of dollars in sunk costs from Mount Pleasant over Highway 41 if they withdraw municipal consent, because SCDOT has not spent any money on this project in the first place.
Second, state-level project funding will not simply disappear if the Highway 41 plan is revised.
Councilmember John Iacofano has noted in a recent post that Senator Larry Grooms, Chairman of the Senate Transportation Committee, has indicated that the $62 million in State Infrastructure Bank funding that has been committed to this project remains available if it is amended, altered, or reconfigured, and that the grant is lost only if Charleston County terminates the project.
That is very different from saying Mount Pleasant withholding municipal consent automatically kills the project or causes every dollar to vanish. It also reinforces the broader point: there is a difference between revising a project and abandoning a project.
Third, withholding municipal consent does not automatically mean Highway 41 will not be improved.
The most important point for residents to understand is that there is no automatic legal switch that gets flipped to end the project if Mount Pleasant withholds municipal consent. Some members of Town Council are considering withholding municipal consent because of the Laurel Hill Parkway spur in order to send a strong message to County Council to reconsider other alternatives, not to stop the project altogether. If Charleston County chooses to terminate the project or move the transportation sales tax funding voters committed to Highway 41 elsewhere, rather than revisit the design and come back to the table, that would be a political decision by Charleston County. It should not be presented as an unavoidable legal consequence of Mount Pleasant standing up for its residents.
There is an important difference between “we cannot improve Highway 41” and “we are choosing not to improve Highway 41 unless Mount Pleasant accepts this exact plan.”
The broader issue is just as important: municipal consent exists for a reason.
If a town can only exercise municipal consent when it agrees with the County and it will be subject to alleged severe financial penalties if it chooses to withhold this consent, then it is not really consent. It is a rubber stamp.
Mount Pleasant has a right and a responsibility to ask whether this project is in the best interests of its residents. That is especially true when the project would permanently alter protected parkland, affect surrounding neighborhoods, and shape traffic patterns across this part of town for generations.
Residents should not be pressured into supporting a flawed project because another government body says it is all or nothing. “Approve this exact design or get nothing” is not doctrine. It is a negotiating position.
Charleston County can choose to come back to the table. It can choose to revisit alternatives. It can choose to honor the 2016 transportation sales tax voters approved to improve Highway 41 without forcing a new road through Laurel Hill County Park.
The County has spent years telling residents this project is a compromise. But a true compromise requires continued engagement when the public identifies serious problems. From the beginning of this plan, for six years the community has been active and vocal in their opposition to this flawed design. The County should work with affected residents to find a better path forward.
Withholding municipal consent is not a vote against improving Highway 41. It is a vote against this version of the project. What should not happen is for Charleston County to walk away from Highway 41 entirely simply because Mount Pleasant refuses to approve the County’s preferred design.
The 2016 transportation sales tax promised Highway 41 improvements. If Charleston County ultimately decides to take those funds elsewhere rather than do the hard work of finding a true compromise, that decision should weigh heavily on the minds of voters when the County asks them to approve another transportation sales tax referendum this November.
Residents should remember who walked away from the corridor.
Now we need residents to gear up for a crucial vote.
The vote on municipal consent is scheduled for Tuesday, July 14 at 6:00 p.m. at Mount Pleasant Town Hall. Please attend if you can. Please speak if you are willing.
Please also send written comments to Town Council at councilclk@tompsc.com or click below to visit the Smart Growth 41 action center to submit your comments.
This is one of the most important moments in the Highway 41 fight. Help us ensure Mount Pleasant stands firm and uses the authority it has to push Charleston County back to the table for a better solution.
Update: June 6, 2026
Action Alert: Mount Pleasant Town Council to Vote on Highway 41. Comments Needed.
Dear Supporters,
Recent reporting has once again created the mistaken impression that the Highway 41 project is moving forward and that construction is imminent. We want to be very clear:
The fight to stop the Laurel Hill Parkway is far from over.
Despite some recent headlines, there was no change in the status of the project as a result of the recent Mount Pleasant Transportation Committee meeting. No permits have been issued. No final decisions have been made. And the regulatory and permitting processes that will ultimately determine whether this project moves forward are still ongoing.
In fact, Charleston County has repeatedly missed its own projected timelines throughout this process. County officials have often suggested that permitting decisions are just around the corner, only for those timelines to come and go without action.
Today, neither the South Carolina Department of Environmental Services (DES) nor the U.S. Army Corps of Engineers has issued the permits required for construction to begin. DES is also expected to hold at least one more public comment period and hearing before making any final decision. Once announced, that process alone could take months to complete, followed by additional time for the agency to review and respond to public comments.
Simply put: the Highway 41 project is not a done deal.
Two Important Opportunities Ahead
While the fight continues on multiple fronts, there are two important opportunities in the coming weeks that could have a significant impact on the future of the project.
1. Mount Pleasant Town Council Vote on Municipal Consent – July 14
The most immediate opportunity for action is an upcoming vote by the Mount Pleasant Town Council.
Tuesday, July 14, 2026
6:00 PM
Mount Pleasant Town Hall
100 Ann Edwards Lane
Mount Pleasant, SC 29464
Four members of Town Council — Daniel Brownstein, Laura Hyatt, John Iacofano, and Jake Rambo — have placed an item on the July 14th town council agenda that would withdraw municipal consent for the Highway 41 project in its current form. Click here to read Councilmember Brownstein’s post.
This vote is critically important.
Without municipal consent, Charleston County would face significant obstacles obtaining the local approvals, rights-of-way access, and encroachment permissions needed to construct portions of the project within Town jurisdiction. At a minimum, withdrawing municipal consent would significantly complicate the County's ability to move forward with the current design. More importantly, it could force County officials to return to the drawing board and seriously evaluate alternative concepts that have not been fully vetted or considered.
Given the County's continued refusal to deviate from a plan that has generated extraordinary opposition from residents, elected officials, and community organizations, this may be our best opportunity yet to encourage the development of a transportation solution that better addresses regional traffic needs while earning public support.
We would like to thank Councilmembers Brownstein, Hyatt, Iacofano, and Rambo for their leadership in bringing this issue forward.
It is worth noting that Mayor Will Haynie, who has previously expressed opposition to the Laurel Hill Parkway made comments at the Town’s June transportation committee meeting that have led us to believe that he no longer supports withdrawing municipal consent or the town working any longer to try and stop the Road to Compromise. We encourage Smart Growth 41 members to respectfully reach out to the Mayor directly and ask him to reconsider this position and instead support withdrawing municipal consent.
How You Can Help
Use the Smart Growth 41 Action Center to Reach out to Elected Officials
Visit Smart Growth 41 to access our pre-populated email form, which allows you to contact Town Council and County Council with just a few clicks. You can also customize the message with your own comments.
**OR **Email Mount Pleasant Town Council and Charleston County Council Directly
If you prefer, you can contact your elected officials directly to share your thoughts.
Share your thoughts regarding the Highway 41 project and whether the Town should withdraw municipal consent.
Let County Council know you continue to oppose the current Highway 41 design and support a better solution.
public-comments@charlestoncounty.org
Attend the July 14 Town Council Meeting
This is the most important action you can take.
Town Council meetings include a public comment period, and each speaker is allowed up to 2.5 minutes to address Council. In-person testimony is often the most effective way to communicate the importance of an issue and demonstrate community support.
If you are able, please plan to attend the meeting and speak in favor of withdrawing municipal consent and opposition to the Laurel Hill Parkway.
2. Additional DES Public Hearing Expected
Charleston County has indicated that the South Carolina Department of Environmental Services is also expected to hold another public hearing regarding the Highway 41 project sometime in July.
The comments received during that process must be considered and addressed before any permitting decision can be made. This will be another important opportunity for the public to influence the outcome of the permitting process.
At this time, no date or additional details have been announced. As soon as Smart Growth 41 receives more information, we will share it with our members.
The Fight Continues
The County may want residents to believe that the Road to Compromise is inevitable. It is not.
Significant permitting decisions remain outstanding. Critical public comment opportunities remain ahead. And now Mount Pleasant Town Council has an opportunity to take meaningful action that could fundamentally alter the future of this project.
Thank you for your continued support, engagement, and commitment to protecting our community.
The Smart Growth 41 Team
www.SmartGrowth41.org
Mount Pleasant Election Day - HIghway 41 Candidate Survey Enclosed [Updated 11/4/25]
Full Candidate Responses to Our Survey:
The following questions were asked of the candidates. You will find their responses below.
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
Will Haynie: I do not support the Road to Compromise Plan as long as the “Southern Parkway” through Laurel Hill Park is in the design. As Mayor, I spearheaded the vote by Council years ago to force the removal of Alternative 7-B that would have re-routed traffic onto Bessemer and into Park West. Town legal counsel advises that the vote negating Alternative 7-B is still authoritative.
Curt Thomas: I support the principle of seeking a balanced, context-sensitive solution for the Highway 41 corridor that relieves congestion, improves safety and evacuation capacity, while minimizing impacts to neighborhoods, natural resources, and parks. However, I would not commit in advance to any single proposed alternative, including Alternative 7 or the “Road to Compromise,” without careful review, further public vetting, and coordination with SCDOT, Charleston County, and relevant stakeholders.
I wish our leadership had worked more closely with the County earlier instead of waiting until now. We have had almost five years to collaborate and voice our community concerns at the table. Because of this delay, we risk losing the 60 million dollars that has already been allocated for this project. If that funding is reallocated to another project elsewhere in Charleston County, our residents will be left without relief from current traffic congestion.
As a former state trooper, I am also deeply concerned that if we lose this funding due to inaction, it could impact our hurricane evacuation route. The volume of traffic leaving the Park West and Dunes West area during an evacuation is already a challenge, and without these improvements, our residents could face dangerous delays in a true emergency.
I am open to a compromise version of the project, but it must be modified to be more community-sensitive, data-driven, and shaped by meaningful public engagement.
Alex Crosby: No, I do not support Alternative 7.
Jenny DeSart: I would support any sort of version that shows purpose and intent and makes sense for Mount Pleasant. The Road to Compromise proposal is not supported by so many residents in Park West and Dunes West, and I do not support this. I think we need to figure out a viable alternative to present as time is limited. A viable alternative that considers both the Phillips community and Park West and Dunes West as well as other residents involved in this area as they are directly impacted by these decisions and should be involved in the process.
Brianna Harmon: No.
John Iacofano: I do not support Alternative 7 or the current “Road to Compromise” proposal. I believe the most practical and responsible approach is to improve the existing Highway 41 corridor and Bessemer Road, rather than pushing traffic around neighborhoods through Laurel Hill County Park.
We can achieve meaningful relief by adding a center turn lane on Bessemer Road, improving intersections, and investing in traffic flow at both Highway 17 and 41. These improvements would help alleviate congestion without dividing communities or disturbing parkland.
I also support the “4-3-4” concept — four lanes south of the Phillips community, three lanes through it, and four lanes north toward the Wando bridge — as a balanced near-term solution. In reality, I think we all know that within 10–20 years, there will be pressure to widen the entire corridor to four lanes. We should plan for that future responsibly now, without prolonging the process any more than necessary.
As a Mount Pleasant Town Councilmember, I attended the County Council meeting when this issue was on the agenda. Despite representing the community directly affected by this project, I was not given the floor to speak, and some members of County Council were downright rude in their handling of the discussion. I also spoke at the DHEC meeting to confirm my position publicly and ensure that Mount Pleasant’s voice was included in the record.
Perry Rourk: I do not support any version of Alternative 7, including the current “Road to Compromise”. I have attended multiple meetings, including the DHEC meeting, where I voiced my opposition to the “Road to Compromise.” I have also attended Charleston County Council meetings regarding Highway 41 and intended to speak at the most recent one, but the Council did not provide the public with that opportunity.
Criag Russack: I will not support any version until I have the documents in hand and actually physically walk the site plan to see how if any adverse effects it has on the residents. I am as you know not a council member at this time and would be negligent in making a solid position without all the facts.
**11/3/25: Candidate responded with the additional clarifying language: No I don’t support the “Road to Compromise” proposal.
Gary Santos: [No responses received]
Mike Tinkey: I am for alternatives where the positive and negative impacts of the Hwy 41 project are equitably shared and have the least impact on the environment. Should the remote opportunity exist to go back to the drawing board this would be a guiding goal for me.
Kathryn Whitaker: I do not support the current “Road to Compromise” proposal or any version of Alternative 7 as it stands today. The process has left too many unanswered questions about environmental impact, neighborhood access, and long-term traffic benefits. I would support a solution that genuinely relieves congestion, protects surrounding communities, and reflects transparent collaboration between the Town, County, and residents.
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
Will Haynie: I do not because the intent of that would be to shift existing traffic from HWY 41 onto our neighborhood roads and that is not in the purpose statement of the HWY 41 improvement plan.
Curt Thomas: I do not support indiscriminate widening of Dunes West Boulevard or Park West Boulevard. Any potential widening must be based on comprehensive studies that consider traffic demand, safety, drainage, and environmental impacts, as well as the overall goals of the Town’s comprehensive plan.
If future studies show that limited widening or turn-lane improvements could ease bottlenecks without harming neighborhood character or the environment, I would be open to those targeted solutions. However, I would insist that any proposal be fully vetted through community meetings and expert review before any action is taken.
Alex Crosby: I do not support further widening of Dunes West Blvd or Park West Blvd.
Jenny DeSart: I believe in talking to the citizens that are most affected by these decisions. If the residents of Dunes West & Park West do not wish to have these roads widened, then I do not think they should be. If there is an alternative viable option proposed that includes this concept, then I would need to discuss this with the citizens of these communities prior to stating a firm response on this issue as they are the ones directly affected by it. From my understanding, this is currently a big no from the residents, so my current response is no.
Brianna Harmon: No
John Iacofano: At this time, I do not support future widening of Dunes West Boulevard or Park West Boulevard.
Our focus should be on smart traffic management and infrastructure optimization, not simply adding lanes. Before considering additional widening, we need to ensure that traffic light timing, turn lanes, and alternate route options are fully optimized. Expanding these roads could encourage more cut-through traffic and negatively impact neighborhood character.
Perry Rourk: I would be willing to explore the potential widening of Dunes West Boulevard from the Highway 41 (Dunes West Blvd / Rivertowne Parkway intersection) to the Bessemer Road roundabout, but only to address current traffic congestion in that area, not as an alternative route for Highway 41.
Craig Russack: I do not support widening Dunes West or Park West Blvd at this time.
Gary Santos: [No responses received]
Mike Tinkey: NO
Karthryn Whitaker: Not at this time. Widening alone is not a sustainable fix for congestion, as it often simply moves the bottleneck. Our focus should be on traffic-flow improvements, signal coordination, and the 17-41 intersection before additional widening is considered. AI models should be able to run large data sets and help us figure out a real solution for congestion on this road. Any proposal should include that full traffic analysis and resident input.
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
Will Haynie: Absolutely not, and I made a point to speak against it at the DHEC public hearing at Wando High School in the summer of 2024 and I personally delivered Town Council’s resolution opposing it to Charleston County Council, incurring the verbal wrath of most of the County Council members.
Curt Thomas: I do not support routing a new connector road through Laurel Hill County Park unless all less impactful alternatives have been exhaustively evaluated and found unworkable. Parks and open spaces are essential to our community’s character, environmental health, and quality of life.
A road through Laurel Hill County Park could have significant negative effects on wetlands, wildlife, and recreational use. This option should only be considered an absolute last resort after full environmental and community review. My position is to protect parkland and preserve its public purpose whenever possible.
Alex Crosby: No, I do not support putting a road through Laurel Hill County Park.
Jenny DeSart: No. The town of Mount Pleasant has spoken. This is something that is not wanted.
Brianna Harmon: I do not support a road through Laurel Hill County Park. Cutting through a beautiful natural park is a sickening option and doing so still does not alleviate the traffic concerns.
John Iacofano: I do not support adding a new road through Laurel Hill County Park. That park is a community and environmental treasure that must remain preserved for public use and ecological protection. Once we open it to vehicle traffic, it will never be the same. Infrastructure solutions should not come at the cost of losing protected natural spaces.
Perry Rourk: I do not support any expansion proposal of Highway 41 that would put a road through Laurel Hill Park. The current plan for the proposed Laurel Hill Parkway would run adjacent to and duplicate Bessemer Road. I believe it would be more responsible to study adding turn lanes on Bessemer Road to improve accessibility, safety, and traffic flow for residents. The current plan also adds more than $40 million to the project cost, along with future maintenance expenses that would ultimately fall on Mount Pleasant taxpayers.
Craig Russack: I do not see a point in adding a road through a park if there is no evidence to support it will actually be an effective means to alleviate traffic flow.
Gary Santos: [No responses received]
Mike Tinkey: NO
Kathryn Whitaker: No. Laurel Hill County Park is a vital green space for Mount Pleasant residents, and cutting a new road through it would permanently alter that natural asset.
4) Mount Pleasant Town Council recently passed a resolution opposing Highway 41 expansion project and is now considering a measure that would withdraw municipal consent from the project. This would force Charleston County to either attempt taking of the land needed from the Town via eminent domain or a redesign of the “Road to Compromise.” Do you support the resolution? And if you are elected to Mount Pleasant Town Council would you support a measure to withdraw municipal consent?
Will Haynie: I have met with town legal counsel several times and as Chair of the Transportation Committee, chaired meetings at which it is discussed. The town attorney maintains that until local consent is granted, the County does not have it. According to counsel, the County must get permit approvals from the state and federal governments and then come ask the town for local consent. In his opinion, there is no need for a resolution opposing something the County does not yet have but must come ask the Town to grant.
Curt Thomas: I support the intent of the resolution in holding the County accountable and protecting the interests of Mount Pleasant residents. However, I believe our leadership should have been working more collaboratively with the County from the beginning. For nearly five years, there have been opportunities for dialogue and compromise that were not fully utilized. Now we find ourselves at a critical moment where withdrawing consent could delay the project further and potentially redirect the 60 million dollars in funding to another part of the county.
If elected, I would support keeping the resolution as a tool for negotiation but would not rush to withdraw consent. We should first exhaust every opportunity to work with Charleston County, SCDOT, and community leaders to refine the design and reach a fair, balanced solution.
As a former state trooper, I am acutely aware of how vital Highway 41 is to hurricane evacuation and public safety. Losing this funding or delaying this project due to slow action could put our community at risk when it matters most.
Alex Crosby: No, I do not and I would not withdraw municipal consent. The town of Mount Pleasant must be an active participant in the project.
**11/3/25: Candidate responded with the additional clarifying language: Yes, I do support municipal consent and if elected I believe the town of Mount Pleasant must be an active participant in the project.
Jenny DeSart: Yes, I support this resolution. Last night, I had a forum in which I expressed that I would not withdraw municipal consent as I was under the impression that they did not need consent because the SCDOT would not be doing the work. I believed if they would do it anyways, then we should not fracture our relationship any more than it already is.
Fortunately, thankfully, after this forum, I was able to have a discussion with people who are more educated in these areas and with citizens who are more involved in this area and realized that we can withdraw municipal consent and it WOULD make a difference, so yes, I would withdraw municipal consent. I do think it is important to communicate with Charleston County and make sure they understand our view point as well as keep a cordial working relationship with them as we will have to work together on so many things. My answer is a yes, I would withdraw municipal consent. Thank you for asking this question at the forum and allowing me to do some research and learn more about this area as I have not been asked this specific question before.
Brianna Harmon: I do support the resolution to oppose the expansion project. I would like to see the county do a re-design of the road to compromise and thus would support a measure to withdraw municipal consent if the plan is not in the best interest of Mount Pleasant residents.
John Iacofano: Yes — Daniel Brownstein and I asked for the item to be put on Town Council along with Jake Rambo’s support. I support the Town Council’s resolution opposing the current Highway 41 expansion plan, and I would support withdrawing municipal consent if necessary.
Withdrawal of consent isn’t about delay — it’s about demanding a fair, transparent process that puts residents first. The County must collaborate with the Town and community stakeholders to find a plan that addresses congestion while preserving Mount Pleasant’s neighborhoods, heritage, and green spaces. Mount Pleasant Town Council members defend Highway 41 vote.
If re-elected, I will champion withdrawing municipal consent from the Town of Mount Pleasant.
Many politicians will jump on this “hot topic” for votes — I’m one who will actually do
something about it.
Perry Rourke: I fully support Town Council’s resolution and attended the Charleston County Council meeting to show my support. If elected, I would also support a measure by Council to withdraw municipal consent.
Craig Russack: I do not have this resolution and can’t speak on whether I would or would not support it but I do not support giving up municipal consent to any outside entity. What happens in our Town should be controlled by our local government which should make decisions based on the will of the people who live here.
**11/3/25: Candidate responded with the additional clarifying language: Yes I support Mount Pleasant withdrawing municipal consent.
Gary Santos: [No responses received]
Mike Tinkey: Yes, I voted for the resolution. Yes.
Kathryn Whitaker: We need to be governing collaboratively, not combatively. I do not support withdrawing municipal consent. While I share the community’s concerns about the current proposal, pulling consent would have serious consequences for Mount Pleasant’s working relationship with Charleston County and could jeopardize other important infrastructure projects. It would be like throwing a grenade into that partnership, and that’s not how we should govern. Instead, we need to repair and strengthen our relationships with County officials and staff so we can work together toward a more balanced, transparent, and effective solution for Highway 41 and the region as a whole.
5) The current “Road to Compromise” design was presented to County Council and voted on without any of the same level of public involvement, comment periods, or years of study and analysis the design team used to ultimately refine the original list of 12 alternatives down to the initially preferred Alternative 1 proposal for Highway 41 expansion.
While several other viable new alternatives were proposed by the community to the design team at stakeholder meetings that occurred in the abbreviated outreach period in the wake of the announcement of the “Road to Compromise” proposal, they were summarily rejected by the design team before they could be seriously studied. Would you support the County withdrawing the “Road to Compromise” proposal that is currently under review by the Army Corps of Engineers to allow such new proposals to be considered and to ensure that any newly proposed solutions go through the same rigorous public vetting process as the original 12 alternatives before any new application is submitted to the Army Corps of Engineers?
Will Haynie: I have had two face to face meetings with the Chairman of County Council recently advocating exactly that. The 4-3-4 design is workable and respectful of Phillips Community and would be every bit as effective without the Southern Parkway spur through the park. I took part in all of the stakeholder meetings prior to the County selecting Alternative 1, five lanes through Phillips, which they subsequently withdrew. I can personally vouch for the lack of transparency and public input as compared to the very long process that led up to Alternative 1 first becoming the preferred alternative.
Curt Thomas: Yes, I would support withdrawing or pausing the “Road to Compromise” proposal to ensure that all community-proposed alternatives are given fair and equal consideration. Every alternative should undergo the same level of technical study, environmental review, and public input that the original 12 options received.
A good process is essential for community trust. If residents feel excluded or ignored, the project will remain controversial no matter the outcome. I would support reopening the dialogue with County and state partners to refine or introduce new alternatives that better reflect the community’s input, safety needs, and smart growth principles.
Summary and Core Principles
As a mayoral candidate, I believe in smart growth, transparency, and collaboration. Our community deserves responsible planning that balances progress with preservation. I will work to:
- Promote smart growth that prioritizes multi-modal, environmentally conscious solutions.
- Ensure that residents of Park West, Dunes West, Phillips, and surrounding areas are active participants in shaping transportation projects.
- Protect our parks, wetlands, and neighborhoods from unnecessary disruption.
- Strengthen collaboration with Charleston County, SCDOT, and the Army Corps of Engineers so that Mount Pleasant has a proactive, not reactive, role in regional planning.
- Safeguard our hurricane evacuation routes and public safety by keeping critical transportation funding in Mount Pleasant.
Mount Pleasant’s growth must be strategic, smart, and safe. That starts with open communication, early collaboration, and leadership that acts before opportunities are lost.
Alex Crosby: Yes, I would support new proposals to be considered and vetted.
Jenny DeSart: Yes, I would support the County withdrawing the “Road to Compromise” proposal that is currently being reviewed by the Army Corps of Engineers to allow new proposals to be considered. I think a viable alternative that shows purpose and intent needs to be presented to avoid this one from happening. The most important input in these decisions should be from the residents who live around it, so they should be involved in the process and that is what my problem with this entire situation is. Citizen involvement should be the priority here.
Brianna Harmon: I would definitely support the county withdrawing the "Road to Compromise" proposal as residents made it very clear that this is not what we want or need. I would support new proposals being considered and studied by multiple agencies and firms. Especially since the cost just increased by $100 million dollars. We had funded this project via an increased sales tax to the county almost a decade ago and we are still no closer to a resolution. It is time for the county and town to work together and take action on this issue before it goes up another 100 million.
John Iacofano: Yes — I would support withdrawing the current “Road to Compromise” proposal so that new and better solutions can be properly evaluated through a fair and transparent process.
However, I want to be clear — I don’t want to lose the funding that has already been secured for
this project. We can and should move quickly and collaboratively toward a revised solution that
balances mobility, safety, and community preservation. I believe as council we should hold a
workshop and invite County Council and stakeholders to attend for open discussion and to work
toward an expedited solution.
Mount Pleasant residents deserve to be part of a true public process, but that doesn’t mean
starting over from scratch. I believe we can refine a solution that includes improvements to
Bessemer Road, intersection upgrades at 17 and 41, and the 4-3-4 configuration — all within a
reasonable timeline that keeps us eligible for funding.
We can protect our neighborhoods, honor community input, and still deliver meaningful traffic
relief without unnecessary delay. I will champion for the Agenda item in November to deny
municipal consent from the Town of Mt Pleasant. Many politicians will jump on this “hot topic”
item that gets votes, I’m one that will do something about it!
Perry Rourke: I fully support withdrawing the “Road to Compromise” proposal and conducting a full public vetting process for all viable alternatives.
Craig Russack: If I were to be elected I would prefer any plans with the scope of this project to be given plenty of time to be studied and understood by all parties involved prior to any vote. I ensure you, the people will have a say in what is being built in their backyards.
Gary Santos: [No responses received]
Mike Tinkey: Yes, recognizing the Hwy 41 project is a Charleston County funded project on a SC State Road requiring Federal approval and the Town’s leverage is limited.
The most recent 41 update from the County at the Transportation Committee states they are moving forward with their preferred alternative.
The town has continued to make improvements to finish road projects, add more infrastructure to enhance safety and ease congestion, and negotiate to ease congestion and improve safety on 41, including but not limited to the following, a number of which I voted for and worked on while on the Planning Commission and now on Town Council:
- RiverTowne and 41
- Town acquisition of the Republic Tract to reduce the planned development which has the potential of over 1,600 homes, septic tanks near the Wando River,41 and connecting roads.
- The building of the Roundabout at Stockdale in Park West has been expedited with temporary traffic signals while under construction
- Tupelo Development on Hwy 17 adding another access road and mitigating the impact of commercial development on the adjoining homeowners
- All American Boulevard and expansion of Billy Swails Bpulevard.
- Vauhn Kee Parkway
- Studying where to add and stage a Rapid Response Vehicle with EMS staff and capability to handle injuries and move vehicles to clear traffic backups
- Ongoing calibration and synchronization of traffic signals.
- Adding turn lanes as indicated through traffic studies.
- Expanding public transit.
- Comprehensive Plan focus of smart and green redevelopment of areas like Mt Pleasant Town Centre for live, work, shop, and play in walkable and bikeable neighborhoods to reduce car traffic
- Expansion of Mt. Pleasant Way
- Expansion of neighborhood recreation options like Carolina Park Recreation Complex, Park West Pool renovation, the baseball field at Cario, the Rifle Range Recreation Complex, and more to keep traffic off 41 and 17.
- Working with Berkeley County to reduce the impacts of their residential, commercial, and industrial development.
Thank you again for allowing me to participate in answering your questions. I am a 42-year-old resident, husband, father, and grandfather, small business owner, community leader, and Town Council member who works daily to keep our town unique and livable for all residents. I will protect Mt. Pleasant’s unique identity while merging preservation with progress to ensure our town remains an exceptional place to live,
Together, we can shape a stronger, greener, and more connected community in Mt. Pleasant
Kathryn Whitaker: Yes. The public deserves the same level of transparency, analysis, and participation that the original alternatives received.
Important Highway 41 Elections and Progress Updates [October 20, 2025]
With the November 2025 Town of Mount Pleasant elections fast approaching, Smart Growth 41 has compiled a candidate questionnaire and scorecard to help voters make informed decisions — especially when it comes to the future of Highway 41.
While the Highway 41 expansion is a Charleston County-led project, the Town of Mount Pleasant plays a critical role. The County depends on the Town for several forms of cooperation — including the granting of municipal consent and approval of project components within Town limits. That’s why it matters where our town leaders stand on this project.
Candidate Responses and Scorecard
We asked every candidate running for Mayor and Town Council to respond to a series of questions about the Highway 41 project and to share their views on the “Road to Compromise.” While Smart Growth 41 will not endorse candidates in this election, we encourage all residents to review our scorecard and their responses carefully.
In reviewing the candidate responses, we did want to flag to your attention those that have taken the additional step of attending public meetings — including those held by Charleston County Council — to raise concerns and speak on behalf of residents. This was specifically noted by candidates Will Haynie, John Iacofano, and Perry Rourk in their responses and we encourage you to dig deeper and learn about those specific actions.
Watch the Candidate Forum — Highway 41 Featured
Smart Growth 41 recently co-hosted a Town of Mount Pleasant candidate forum alongside Mount Pleasant Votes. The event was moderated by our chairman, Travis Korson, and covered a wide range of local issues, including Highway 41.
Click here to view a recording of the forum and to jump directly to the Highway 41 discussion
Don’t Fall for the County’s Spin — The Fight Is Not Over
Despite some recent reports, the Highway 41 project is not a done deal and construction is not imminent:
- No permits have been granted by SCDHEC or the U.S. Army Corps of Engineers.
- A federal public comment period is still expected with the Army Corps of Engineers. This will include a public hearing and could take months to resolve.
- The County has repeatedly missed its own deadlines throughout this process.
- Critical concerns remain unanswered — including environmental impacts, regulatory compliance, and the destruction of publicly preserved green space.
The bottom line? County officials may want the public to believe this project is inevitable — but it is not. And voters deserve representatives who will not back down or accept half-truths as final answers.
Early Voting Starts Today
We encourage all residents of Mount Pleasant to make your voice heard by casting a ballot. Early voting opens today, Monday, October 20, and continues through Tuesday, November 4. You can check your registration, find polling places, and learn more at scvotes.gov.
Thank you for staying engaged — and for continuing to fight for smarter growth, better infrastructure, and a Highway 41 solution that works for all of Mount Pleasant.
July 14th Update: 🚨 Important Win in Mount Pleasant — Now Urge County Council to Act
Dear Supporters,
We have great news to share — and a critical opportunity to keep the momentum going in our fight against the Laurel Hill Parkway.
Last week, the Mount Pleasant Town Council voted overwhelmingly to pass a resolution formally opposing the Laurel Hill Parkway and made it clear that the Town stands united in its opposition to this unnecessary and harmful road. We are incredibly grateful to the Council for taking this strong stand, and to the many Smart Growth 41 supporters who filled the room, spoke during public comment, and helped deliver this powerful message.
Your voices are making a difference — and now, Charleston County Council is taking notice.
County Council to Consider Foregoing the Parkway — But They’re Not Ready to Act Yet
At its next Finance Committee meeting this Thursday, July 17, County Council will discuss the possibility of removing the Laurel Hill Parkway from the Highway 41 project.
However, this is currently only listed as a “discussion item” — which means Councilmembers won’t take immediate action. Instead, they could delay a vote for another 60 days, during which time the permitting process for the Parkway could move forward and momentum to stop the Laurel Hill Parkway could be lost.
That’s why we’re joining Councilmember Larry Kobrovsky on calling on the rest of County Council to make this an “action item” and vote now to remove the Parkway from the Highway 41 design.
How You Can Help
✅ 1. Email County Council Today
Tell Councilmembers that delaying this decision isn’t acceptable — and urge them to act now to remove the Laurel Hill Parkway from the project.
📧 Public-Comments@charlestoncounty.org
Suggested message:
“Thank you for taking time to consider alternatives to the Laurel Hill Parkway, but there is no longer any reason to delay this decision by making it a discussion item. Many members of the community have been speaking out against this road for years and I urge you to take immediate action and formally vote to remove the Parkway from the Highway 41 project.”
✅ 2. Attend the Finance Committee Meeting
Even though public comment is now allowed at the finance committee meeting, your presence matters. A strong turnout could help tip the balance and push County Council toward immediate action.
🗓 Thursday, July 17
⏰ 5:00 PM
📍 Charleston County Council Offices
4045 Bridge View Dr, North Charleston, SC 29405
Look for our Smart Growth 41 volunteers outside — we’ll be handing out stickers again to show unified support.
This Is Our Moment — Let’s Not Lose Momentum
The Town of Mount Pleasant took a clear stand. Residents are engaged and there is a real opportunity to change the course of this project.
But it won’t happen if County Council delays. Let’s make sure they hear loud and clear: we need action — not just more discussion.
Thank you for staying in the fight.
🚨 Action Alert – Mount Pleasant Town Council to Vote on Laurel Hill Parkway Resolution July 8, 2025
On Monday, June 30th, the Town of Mount Pleasant Transportation Committee voted unanimously (4-0) to advance a resolution that formally expresses the Town’s disapproval of the Laurel Hill Parkway portion of the Highway 41 project. Thank you to Councilmembers Daniel Brownstein and John Iacofano for advancing this resolution and to the Transportation Committee members for voting in favor of this resolution. This is a critical milestone that shows our voices are being heard. The resolution will now go before the full Mount Pleasant Town Council for a final vote on: Tuesday, July 8th at 6:00 PM and we encourage you to attend this town council meeting to show your support.
Why This Matters
Building the Laurel Hill Parkway would cut through Laurel Hill County Park, destroy historic and natural resources, and negatively impact surrounding neighborhoods. It is an unnecessary and harmful segment of the Highway 41 expansion that fails to solve the corridor’s long-term traffic challenges in a sustainable way.
Additionally, Charleston County has already begun the process of acquiring right-of-way (ROW) to build the Parkway, including land currently owned by the Town of Mount Pleasant. By withholding municipal consent to sell or transfer this land, the Town could delay construction significantly – or even prevent the County from building the Laurel Hill Parkway altogether.
Finally, passing this resolution could directly influence the South Carolina Department of Environmental Services (DES) as it decides whether to issue the necessary state permits for the project. If DES denies its permit, the Army Corps of Engineers is very unlikely to approve theirs – effectively stopping this road from moving forward.
How You Can Help
✅ 1. Attend the Town Council Meeting
Your presence shows the Council that community opposition remains strong.
🗓 Tuesday, July 8th at 6:00 PM
📍 Mount Pleasant Town Hall, 100 Ann Edwards Ln
👉 Consider speaking in support of the resolution during public comment.
⚠️ Arrive early to sign up to speak – speaker sign-up typically closes before the meeting begins.
✅ 2. Email Town Council (if you haven’t yet)
Urge them to vote YES on the resolution opposing the Laurel Hill Parkway.
📧 councilclk@tompsc.com
This is a pivotal moment. Every email, every comment, and every person in the room makes a difference. Let’s ensure the Town of Mount Pleasant takes a strong stand against this harmful and unnecessary project.
Thank you for your continued dedication to protecting our community and advancing smarter solutions for Highway 41.
June 26, 2025 Update: Response to Recent County Updates — Take Action Now
Dear Supporters,
Many of you have likely heard about the Charleston County Finance Committee meeting held this past Tuesday, June 24th. During that meeting, a county representative claimed that the U.S. Army Corps of Engineers is expected to issue its notice of intent to issue a permit for the Highway 41 project within the next 60 days.
We want to set the record straight: Smart Growth 41 does not believe this statement accurately represents the facts on the ground. Based on everything Smart Growth 41 has learned, there are still many steps left in the permitting process — and the fight to stop this flawed project is very much still alive.
Why the County’s Timeline Doesn’t Add Up
Contrary to the impression given at the recent Finance Committee meeting and from what we understand, the Army Corps of Engineers cannot issue a permit until the South Carolina Department of Environmental Services (DES) completes its own permitting process. That process is still ongoing and far from resolved.
Here’s a detailed timeline of recent developments:
-
DES must issue its permit first.
Federal permitting by the Army Corps is contingent on DES competing its part of the permitting process. Without a decision from DES to approve or deny its permit, the Corps cannot proceed. Given the outstanding concerns and incomplete information submitted by the County, a decision from DES is not expected any time soon — and would be highly unlikely within the next 60 days. -
Smart Growth 41 and State Representative Kathy Landing have been working closely with DES.
After DES held a public hearing last June at Wando High School, no updates were provided for months. In November, Rep. Landing contacted DES to request a status update and was told that DES had been delayed due to the complexity of the Laurel Hill Parkway segment and had not yet received all required information from Charleston County. -
In February, Rep. Landing met with DES leadership in Columbia.
Rep. Landing met with the Director of DES and a staff member from DES who attended the June hearing. She received an update that DES was still waiting on technical responses from the County. Recognizing the importance of the project’s implications, the Director of DES agreed to travel to Charleston to conduct a site visit. -
That site visit occurred in April.
DES leadership received a full briefing and toured the potentially impacted areas with Rep. Landing alongside Smart Growth 41 and representatives from neighboring communities. During the visit, DES shared the formal questions it had submitted to the County following public comments at last year’s hearing (read here), along with the County’s initial responses — many of which Smart Growth 41 found to be inadequate. As a result of that meeting, DES requested that we provide additional follow-up information to address ongoing concerns. -
Following the visit, both Smart Growth 41 and Rep. Landing submitted formal letters to DES.
-
Smart Growth 41 submitted a detailed environmental impact letter (read here).
-
Rep. Landing submitted her own letter challenging the county’s traffic assumptions and outlining constituent concerns (read here).
-
-
These letters were submitted only in recent weeks.
DES is now reviewing this information that has been provided by Smart Growth 41 and Rep. Landing and from what we understand plans to submit a second round of questions for the County to respond to — a process that will likely take several more months, not weeks. Until that is complete, DES will not make a decision on its permit, and neither can the Army Corps.
Despite this reality, we have heard from some residents along the proposed route that the County has begun prematurely initiating Right-of-Way (ROW) acquisitions for the Laurel Hill Parkway segment — sending out official letters to landowners. We believe this is an irresponsible and inappropriate step given the unresolved permitting status.
If you or someone you know has received such a letter, please email us at info@smartgrowth41.org (and include a copy of your letter if possible) so we can work to determine the best way to respond.
🔧 Action Item: Support Mount Pleasant Town Council's Resolution
In response to these troubling developments, the Mount Pleasant Town Council is considering a resolution in the town Transportation Committee to officially oppose the Laurel Hill Parkway portion of the Highway 41 project. Mount Pleasant Town Councilmembers Daniel Brownstein and John Iacofano introduced the resolution and the request was approved by the chairman of the town Transportation Committee, Mayor Will Haynie.
This is a critical opportunity for those concerned about the current Highway 41 project design to have their voices heard and influence the project’s future. Here’s how you can help:
✅ Send an Email to Town Council
Tell them you support the resolution to oppose the Laurel Hill Parkway:
📧 councilclk@tompsc.com
📆 Attend Upcoming Meetings and Provide Comment in Support of the Resolution
-
Transportation Committee Meeting:
🗓️ Monday, June 30 at 1:15 PM -
Full Town Council Meeting:
🗓️ Tuesday, July 8 at 6:00 PM
📍 Both meetings will be held at Mount Pleasant Town Hall, 100 Ann Edwards Ln, Mt Pleasant, SC 29464
📣 Contact Charleston County Council
Let them know you continue to oppose the “Road to Compromise”:
📧 public-comments@charlestoncounty.org
Passing this resolution is not only important symbolically — it could weigh heavily in DES’s final decision. If DES denies its permit, the Army Corps is very unlikely to issue a permit for the project, which would effectively block the project from moving forward.
The bottom line: the fight is not over. The permitting process is still underway, and there are still multiple points of leverage where we can stop this project from moving forward and harming our community.
Thank you for staying engaged and continuing to fight for a smarter, more sustainable solution for the Highway 41 corridor.
|
|
![]() |
|
|
Updated October 21, 2024
Vote "NO" on Charleston County Transportation Sales Tax
This election season residents of Charleston County will be presented with the opportunity to vote on a new ½ cent sales tax to fund transportation projects in the region. Smart Growth 41 encourages you to vote NO.
Approving these ballot questions would, in effect, allow for a continuation of the funding stream that is meant to pay for such projects as the failed “Road to Compromise” design for Highway 41 expansion. Smart Growth 41 continues to oppose this ill-conceived plan.
Until such time as the Charleston County Council abandons this flawed road design in favor of something better, we cannot be left with enough confidence that they will be good stewards of the additional $5.4 billion in taxpayer dollars they are requesting to raise through this referendum. While this is not the case for every current sitting member, the fact remains that the majority of the Council has simply done nothing to dispel our concerns that these additional funds will not be used to push similarly ill-conceived road projects.
Furthermore, Charleston County residents already face some of the highest sales tax rates in the country. According to analysis from the Tax Foundation the 9% sales tax rate that Charleston County residents pay is one of the highest sales tax burdens in the country. Charleston County residents are already taxed enough, and they certainly should not be forced to send more good dollars after bad road projects.
Early voting in South Carolina starts TODAY, Monday, October 21st and we encourage all supporters of Smart Growth 41 to vote NO on Charleston County Special Sales and Use Tax Question 1 and 2. For more information on voting dates, times, and locations, or to view a full sample ballot and check your voter registration status, please visit www.scvotes.gov.
Thank you for your continued support.
Updated: May, 2024
(This is a different comment request than from the summer of 2023)
Smart Growth 41 has just been notified that the South Carolina Department of Health and Environmental Control (SC DHEC) has issued the updated Public Notice for rescheduled the Public Hearing regarding Charleston County’s application for the state required permits for Highway 41 project and proposed Laurel Hill Parkway.
You can read the updated permit application here:
https://epermweb.dhec.sc.gov/ncore/external/publicnotice/info/2153805530855226594/comments
The announcement now starts a comment period which will end on June 20th and where feedback can be provided. You can submit comment through the Smart Growth 41 portal by clicking below or by visiting the SC DHEC website directly. If you were one of the more than 500 people that previously submitted a comment to DHEC at the beginning of this year, there is no need to submit a new comment, as they will carry through. Continuing to gather comments in opposition to the project is important through, so if you have not already submitted a comment to DHEC this year, please stay do so before the deadline.
The in-person hearing will take place on Wednesday, June 5th at 6:00pm at Wando High School Performing Arts Center, 1000 Warrior Way, Mt Pleasant, SC 29466.
We are hoping to have a strong in-person showing at the public hearing, so please come if you can – even if you do not plan to make comments.
**Please click here to fill out the form if you plan to make comments at the public hearing**
While this DHEC coastal zone management permit public hearing is an important procedural step, it is completely separate from the not-yet-scheduled Army Corps of Engineers (ACOE) Hearing, which will serve as a far more significant procedural step in determining any final approvals for the Highway 41 project. At present, there is no indication that the Army Corps of Engineers is moving forward with a public meeting in the immediate future, but we still expect one to be announced at some point this summer/fall. Smart Growth 41 is monitoring this situation closely and will continue to provide additional updates to the community as things develop.
Background Information on the Upcoming Public Hearing
This permit application is a legally required procedural step by the state of South Carolina that must occur for the Army Corps of Engineers (ACOE) to proceed with its ongoing internal and federal interagency approval or denial deliberations. Typically, this application runs concurrent with the ACOE review process, but it appears that the process has been delayed due to the extensive comments submitted after the ACOE issued its own public notice on June 9th, 2023. The June 5th, 2024 SC DHEC public hearing, is the State’s first public step in clearing their own separate procedural requirements.
The notice of the permit application does not indicate the status of the pending ACOE permit decision and serves as one of the only opportunities for the State to formally comment on the ACOE Application. Although the permits appear related, it is important to note that the State’s decision to issue or deny a permit under South Carolina’s Coastal Zone Management laws is separate and exclusive from the entirely different set of more stringent federal rules and criteria for approval that the ACOE process must follow.
Issuance or denial of the permit by SC DHEC merely serves as the official State comment, required to complete one of the numerous other sections in the administrative record the ACOE must fulfill before moving forward with permit decisions. Additional comments from State Historic Preservation Office, and federal agencies such as U.S. Fish and Wildlife, Environmental Protection Agency, Department of Transportation, and comment at a public hearing are also likely to be sought before a decision is made on the Army Corps of Engineers permit application.
UPDATE: November 4th, 2023.
Mount Pleasant Town Council Elections
With less than one week until election day, all residents of the Palmetto State are encouraged to go out and vote.
In anticipation of that election and as was mentioned in our previous email, Smart Growth 41 recently set out to clarify the positions of the candidates for Mount Pleasant Town Council regarding the expansion of Highway 41. While a County project, there are several aspects of the Highway 41 expansion where the County is expected to look to the Town for cooperation and consultation.
The Smart Growth 41 Committee will not be making any formal endorsements in any of the elections, but based on the responses we received, we believe that the following candidates are most aligned with our position on the Highway 41 project: Daniel Brownstein, Mark Flannery, Laura Hyatt, Jake Rambo, Perry Rourk, and Shari Sebuck.
The full responses are below in this email and will be available to view and share both on the Smart Growth 41 website (https://smartgrowth41.org) as well as our Facebook page (https://www.facebook.com/profile.php?id=100070135268732). We have compiled these responses for informational purposes for any Town of Mount Pleasant residents that are concerned about the expansion of Highway 41 or who have an interest in knowing where the candidates stand on this major infrastructure project. We hope this will serve as a valuable resource and as a supplement to your research about the policy positions of the various candidates.
If you have any other questions about the upcoming election or need to confirm your voter registration status or polling place, please click here to visit the Charleston County Board of Elections website.
Sincerely,
Smart Growth 41
Highway 41 Policy Responses from Mount Pleasant Mayor and Town Council Candidates
Introduction
In advance of the Town of Mount Pleasant Mayoral and Council elections, the Smart Growth 41 Committee set out to clarify the positions of the various candidates regarding the expansion of Highway 41. While a County project, there are several aspects of the Highway 41 expansion where the County is expected to look to the Town for cooperation and consultation.
Smart Growth 41 will not be making any formal endorsements in any of the upcoming elections, but has compiled these responses for informational purposes and as a resource for any Town of Mount Pleasant residents that are concerned about the expansion of Highway 41 or who have an interest in knowing where the candidates stand on this major infrastructure project. If other candidates ultimately provide responses between now and election day, those will be updated to the website as they are shared.
We hope this will serve as a valuable resource and as a supplement to your research about the policy position of the various candidates and encourage all residents of Mount Pleasant to go out and vote on Tuesday, November 2nd.
Questionnaire
The following questions were asked of the candidates. You will find their responses below:
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
4) What do you think is the best solution for Highway 41 expansion in Mount Pleasant?
- Expand Highway 41 to 4 lanes, including through the Philiips community (Alternative 1)
- Expand Highway 41 to 4 lanes except not through the Philiips community and expand Dunes West Boulevard to 4 lanes (Alternative 7B)
- Expand Highway 41 to 4 lanes except not through the Philiips community and add a new road (Laurel Hill Parkway) as Charleston County has proposed (Road to Compromise Proposal).
- Expand Highway 41 to 4 lanes, except not through the Phillips community, and create new intersections to replace the current Joe Rouse Rd. and Dunes West Boulevard intersections, without expanding Dunes West Boulevard or adding a new road (Laurel Hill Parkway)
- Do Nothing
- Propose Another Solution (please explain in detail)
(Please Note: Question 4 has been abbreviated in the below responses for formatting purposes. Please refer to this “Key” if you need any clarification regarding the full question as you read through the responses)
Responses from Mayoral Candidates
Brandon C. Armstrong
Could not be reached to provide a response.
Will Haynie
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
I have been very clear in my communications with Charleston County Council, including my in-person comments to them at their August 2021 meeting, that they MUST return to the public, transparent stakeholder meetings before arriving at alternatives that none of us have seen before the County puts them out there as possibilities. I participated in the stakeholder meetings for years and they were public, on the record, and had numerous groups at the table giving input. When Alternative 7A came out, I called a special meeting of Town Council to invoke the local consent version of state law to eliminate it as a possibility insofar as the law allows, which is prohibiting such a design from attaching to and affecting town-owned infrastructure. I have asked the town’s legal counsel for an opinion on whether that vote applies to any subsequent version of Alternative 7 such as the one that is out there now as part of the Road to Compromise. The part of any alternative that I do support is the 4-3-4 lane design using the current right of way for HWY 41. The Phillips Community has agreed to 3 lanes through it, so this should be doable.
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
I see no need for future widening of Dunes West or Park West Boulevard. As a member of town council and as mayor, I strongly supported the widening of Park West Boulevard because it was requested by the community and the member of town council who lived there. Unless and until our own residents come to us requesting a widening, there is no reason to do so to accommodate through-traffic comprised on non-residents.
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
I have personally told our two East Cooper resident members of Charleston County Council that I do not support nor see the need for the road going through Laurel Hill Park. They cite the justification for it as the level of service proviso in the corridor improvement requirements.
4) What do you think is the best solution for Highway 41 expansion in Mount Pleasant?
At present, there appears to be a desire for Charleston County Council to choose the “least bad” alternative. In that case, as I told them in person at the August meeting, it is time to hit the pause button, reassess the latest traffic data (including the effect of the completion of Park West Boulevard widening), and build the interim improvements approved and funded by the Town and Charleston County together. Choice “D” on this list [Expand Highway 41 to 4 lanes, except not through the Phillips community, and create new intersections to replace the current Joe Rouse Rd. and Dunes West Boulevard intersections, without expanding Dunes West Boulevard or adding a new road (Laurel Hill Parkway)] is otherwise the most acceptable alternative.
Kathy Landing
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
No, absolutely not.
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
No.
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
No, absolutely not!
4) What do you think is the best solution for Highway 41 expansion in Mount Pleasant?
Candidate indicated that she would prefer option D [Expand Highway 41 to 4 lanes, except not through the Phillips community, and create new intersections to replace the current Joe Rouse Rd. and Dunes West Boulevard intersections, without expanding Dunes West Boulevard or adding a new road (Laurel Hill Parkway)].
The candidate also elaborated on another potential solution: Start with the 4-3-4 for now. 10 years from now, the Phillips Community may actually welcome a Boulevard style solution with 4 narrow lanes with a planted median. It would be more attractive and not require taking land.
Responses from Town Council Candidates
Kevin Andrus
Declined to provide a response.
Jason Daley
Declined to provide a response.
Gary Davis
Declined to provide a response.
Lee Dittrich
Please share with the residents that I am a resident of Dunes West myself and that I am supporting Alternative 1 for a variety of reasons: (1) safest design to expand existing path of Highway 41; (2) lowest cost; (3) no environmental impact to Laurel Hill County Park; and (4) least amount of acreage impacted by the project.
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
No, I am opposed to any version of Alternative 7, including the “Road to Compromise” for the Highway 41 expansion. Deviating from the existing path of Highway 41 to encroach on the Laurel Hill County Park impacts a greater amount of acreage, has significantly higher costs, wetland encroachment and includes roadway designs that have hazardous curves presenting safety issues for motorists.
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
No, I do not support any future widening of Dunes West Boulevard or Park West Boulevard.
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
No, I do not support any expansion that encroaches on the wetlands of Laurel Hill County Park that will have an environmental impact.
4) What do you think is the best solution for Highway 41 expansion in Mount Pleasant?
(A) Expand Highway 41 to 4 lanes, including through the Phillips community (Alternative 1)
John Iacofano
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
I would like to preserve our parks and Laurel Hill is a beautiful park that needs to remain intact.
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
Does expanding Dunes West and Park West Boulevard help alleviate the issue? I know that Park West was just widened. If the residents of Dunes West and Park West support the further widening of these roads to direct traffic towards 17 then I would support the expansion.
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
Not with what I have been shown.
4) What do you think is the best solution for Highway 41 expansion in Mount Pleasant?
If D [Expand Highway 41 to 4 lanes, except not through the Phillips community, and create new intersections to replace the current Joe Rouse Rd. and Dunes West Boulevard intersections, without expanding Dunes West Boulevard or adding a new road (Laurel Hill Parkway)] works then this seems to be the best proposal.
I also see a very short section between the end of Hubbell Drive and Faison Road next to the airport that could possibly help alleviate about 100+ homes with a very short bridge and road. This would have a large effect on the homes at the end of Hubbell Drive as they are used to being the dead end and would add traffic to the street. A very small extension that quickly gets cars to 17.
Cooperation with City of Charleston to continue to expand Clements Ferry Road.
Revisit a 41/17 intersection that was proposed and was turned down due to it being “to city like” although it was proven to improve traffic flow and grants were available to assist in paying for the intersection.
Myra Jones
First, let me preface my remarks by stating that I have spoken to various citizens and Town, County and State level officials. No one has a clear and “best” solution to this issue at this point. It is a moving target. We all know that this is a Charleston County project; however, the Army Corps of Engineers will have a major say-so before any plan is put in place.
The nature of traffic and the areas served by Highway 41 will change significantly before any changes to the road are final. We must look in the crystal ball and determine what would be best for 2025 and future years. A major concern is to provide a sufficient hurricane evacuation route for Mt. Pleasant residents to use as an alternative to I-26 or other roadways.
While we must limit impact on any residential community along the path, we must also be mindful of preserving and enhancing the natural landscape in the area. We must consider the wetlands, flooding/drainage, trees and green space in any proposal. With climate change and rising sea levels, we cannot afford to diminish environmentally important lands and greenery.
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
This option concerns me primarily with the takeover of park lands, and for the reasons set forth above.
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
I am concerned that further widening of Park West Blvd. and/or Dunes West Blvd. would be detrimental to the residents of the neighborhoods, property values and the associated revenue to the Town of Mount Pleasant and the safety of the residents.
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
I believe the Park should not be disturbed by a high-traffic road, for environmental and safety reasons.
4) What do you think is the best solution for Highway 41 expansion in Mount Pleasant?
It has been proposed to me that the best solution would be to provide another roadway which links to Highway 17 north of Mount Pleasant and would travel through a portion of the Francis Marion Forest. This plan is worthy of consideration as it would have minimal impact on established neighborhoods, property values and safety of the residents. It may also be a less costly roadway to build, saving the County money in the long run. It would also be a long-term solution, not short-term as some of the other options discussed by the County are doomed to be. No matter what the plan turns out to be, additional stop lights should be added to Hwy 41 at the major intersecting roadways.
Carl Ritchie
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
I do not.
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
I do not. We finally got Park West Blvd completed and it is working well. I do not see a need for more widening or construction on these roadways.
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
I do not support a road through Laurel County Park.
4) What do you think is the best solution for Highway 41 expansion in Mount Pleasant?
I would support this alternative…”D”[Expand Highway 41 to 4 lanes, except not through the Phillips community, and create new intersections to replace the current Joe Rouse Rd. and Dunes West Boulevard intersections, without expanding Dunes West Boulevard or adding a new road (Laurel Hill Parkway)]
Gary Santos
Declined to provide a response.
Shari Sebuck
1) Do you support any version of Alternative 7 for the Highway 41 expansion project, including the current "Road to Compromise" proposal?
After looking and reading through all the materials, it appears plans have been renamed and changed and it’s very confusing - even to me - a Hwy 41 resident that has followed the Hwy 41 fiasco. I am not a fan of the “road to compromise” because of the wetlands and park it would destroy. My main concern is will it make areas (homes and businesses) a flood plain that was not before? Concrete does not hold water! As a first time candidate I would need to read and review all of these studies, impacts, traffic counts and data. Years ago, I sent a letter to Larry Grooms supporting the plan to go straight down Hwy 41. This was before the Philips community was made historical.
2) Do you support any future widening of Dunes West Boulevard or further widening of Park West Boulevard?
Why would this be necessary? I need facts and data.
3) Do you support any Highway 41 expansion proposal that includes adding a new road between Highway 41 and Park West Boulevard through Laurel County Park?
Not at this time without further review.
4) What do you think is the best solution for Highway 41 expansion in Mount Pleasant?
Again, I am empathetic to the plight of the historical Phillips community. I am empathetic to Heirs property. I am also empathetic to the property rights of DW and PW resident. I would want to see all traffic counts, and reasoning for any alternative route that would cost more money, impact a higher number of residents, and negatively impact our environment - and thus residents in time of flooding or hurricanes, etc., to justify the alternative. At the moment, without that information, A [Expand Highway 41 to 4 lanes, including through the Philiips community (Alternative 1)] and D [Expand Highway 41 to 4 lanes, except not through the Phillips community, and create new intersections to replace the current Joe Rouse Rd. and Dunes West Boulevard intersections, without expanding Dunes West Boulevard or adding a new road (Laurel Hill Parkway)] would be where I would want to start comparing numbers.
GM Whitley
Declined to provide a response.
Robert Yarbrough
Could not be reached to provide a response.
Smart Growth 41 is a coalition of citizens working to advance the best transportation solution for the Highway 41 expansion in Charleston County.
Our Primary Concerns are with
Identifying The Best Travel Solution
The “Road to Compromise” proposal does not address traffic in the neighborhoods it plans to bisect. It also is a poor solution considering the estimated 18,000 home units being built in Berkley County which will use Highway 41.
Child & Pedestrian Safety
The “Road to Compromise” proposal poses a safety risk by routing highway traffic into neighborhood streets and posing a safety risk to pedestrians and cyclists.
Severe Environmental Loss
A massive area of forest and marshland will be lost forever if the “Road to Compromise” is built.
Cost to The Taxpayer
"The Road to Compromise" will cost $23 million more than what was originally budgeted for Highway 41 expansion. This shortfall will likely need to be covered by higher taxes or by redirecting funds from other County transportation projects.
The Facts
The “Road to Compromise” proposal would be $23 million more expensive than what was originally budgeted for this project, more adversely affect the surrounding environment, and fail to address the future growth needs of our region.
The Facts
The “Road to Compromise” proposal would be $23 million more expensive than what was originally budgeted for this project, more adversely affect the surrounding environment, and fail to address the future growth needs of our region.
For over five years Charleston County has been working to identify a solution to alleviate the current and worsening traffic problems on Highway 41. After an extensive study period it was determined that Alternative 1, widening the existing Highway 41 right-of-way, was the most practical and effective transportation solution to alleviate area traffic issues and accommodate future growth in the region. It would accomplish this goal at the lowest cost to the taxpayer and with the smallest environmental impact.
Along the way several misconceptions developed regarding the preferred Alternative 1 solution. Charleston County is now in the process of revisiting a modified version of the previously rejected Alternative 7 proposal to widen Highway 41. Colloquially known as the “Road to Compromise”, it would be $23 million more expensive than what was originally budgeted for this project, more adversely affect the surrounding environment, and fail to address the future growth needs of our region.
Smart Growth 41 was created to dispel this confusion surrounding the expansion of Highway 41 and to find the solution that would have the lowest cost and greatest benefit to Charleston County. At the start of this process several evaluation criteria were established to determine which proposed expansion of Highway 41 would best meet the project need. The leadership of Charleston County should lean on this scorecard and adopt a facts-based approach when determining their final design for this project.
Environmental Impact
Environmental Impact
The "Road to Compromise" will destroy a large section of park forest, disrupting wildlife permanently.
Hawks, Alligators, Turkey, Deer, Ducks, Cranes, Heron, Coyotes, Wild Cats, and more will lose their territory and very likely their ability to survive.
These photos were taken of wildlife living in the forest that would be impacted by the new highway
The below drone footage shows the area of Charleston county forest that will be destroyed for The "Road to compromise".
In fact, our drone range wasn't far enough to show the entire path of deforestation.
The map below shows the new Laurel Hill Parkway path through the
forest wetlands and skirting neighborhoods in Park West.
Child and Pedestrian Safety
Child & Pedestrian Safety
The “Road to Compomise” will route highway traffic through a congested pedestrian area with walkers, joggers, bicyclists, and young children that has previously experienced tragic accidents. Dramatically increasing the number of vehicles driving through this area will greatly increase the potential and probability for more accidents involving pedestrians.
School Children Hit by Cars
The proposed extension splits 2 neighborhoods, and will force families to regularly cross a four lane highway to access public schools, child care, parks, and amenities, causing a safety hazard.
In Park West alone, there have been 2 publicized accidents where children using the crosswalk have been hit by a vehicle, despite numerous safety measures such as a crossing guard and flashing warning lights.
“All of the cars had stopped on both sides and then when she started to go out, this truck just came around from nowhere and hit her,” said Rogge. “When the truck hit her, her whole body went flying over to that side in the air. She had a fractured skull and she had road rash all over her, she had stitches all up in her mouth, she was in the hospital for three days”
Increased Traffic Volume equals higher rates of pedestrian incidents
Rerouting existing highway traffic through more densely populated neighborhoods could increase the scale of traffic incidents involving pedestrians. Current traffic models estimate that 7,800 cars per day take a trip through these neighborhoods, but if the "Road to Compromise" is advanced, that is estimated to increase to 23,800 trips by 2040.
The "Road to Compromise" negatively impacts the safety of the 606 dwellings off of Dune West Boulevard, as well the 1782 dwellings in Park West (the two neighborhoods that would be most affected by this project). Bicyclists and young children have already been hit at crosswalks this year in the direct path of the new proposal as reported on the NextDoor app (April and June) [Click to read more] and that will likely increase if more traffic is routed through these neighborhoods.
Why Take The Risk?
Common Misconceptions
The #1 misconception is home displacement. No Homes would be displaced in the Alternative 1 plan.
Myth: The "Road to Compromise" is a new proposal to Highway 41.
Fact: The "Road to Compromise" is a slightly modified version of Alternative 7, a previously considering proposal to widen Highway 41. Alternative 7 was rejected due to the higher costs, more significant environmental impacts, and longer drive times associated with the plan as well as its failure to address the future growth needs of the region.
Myth: The previously approved Alternative 1 plan for Highway 41 has been revisited because of concerns that additional land would need to be acquired and homes would be taken in order to complete the project.
Fact: Existing right of way is sufficient to complete the Alternative 1 proposal for Highway 41 without any additional improvements provisioned for by the county. Only 15 feet of additional right of way on each side of the proposed corridor would be required in order to move forward with the previously approved and recommended plan to widen the existing Highway 41 Route. This additional right of way would not be used for travel lanes, but instead would be used to create a center turn lane requested by the communities located along the Highway 41 corridor as well as a landscaped sidewalk and recreational path.
Myth: The new “Road to Compromise” proposal for widening Highway 41 will not be any more expensive than what was previously budgeted for Highway 41 expansion.
Fact: The “Road to Compromise” will cost almost $30 million more than what was originally budgeted to expand Highway 41. To cover this shortfall some combination of additional tax revenues and budget cuts to other important programs and transportation initiatives will need to likely need to be enacted.
Myth: The "Road to Compromise" is the most environmentally sound solution to widen Highway 41.
Fact:
The rationale previously used for selecting Alternative 1 over Alternative 7 (a plan similar to the “Road to Compromise” that was previously rejected) was sound, thorough and compelling in virtually every measurable category of the NEPA (National Environmental Protection Act) analysis. Alternative 7 was inferior to Alternative 1 in almost every category defined in the National Environmental Protection Act (NEPA) process. The “Road to Compromise” does not seem to address or improve any of the well documented detrimental aspects of Alternative 7 including:
- A larger construction footprint
- The creation of a new major drainage system which will displace hundred of millions of gallons of road runoff into pristine rivers and marshes
- Major environmental disturbances to Laurel Hill County Park
- Increases in automobile pollution due to longer travel times for drivers
Myth: Highway 41 needs to be widened to account for additional traffic from Dunes West and Park West as there are still several thousand houses left to be built out in both communities.
Fact: Construction of new houses in Dunes West and Park West is nearly complete. There are less than 100 houses to be built out between the two communities. This lessens the feasibility of reducing Highway 41 from four to three lanes at the entrance to these communities, as the additional traffic traveling on Highway 41 will mostly be due to development in Berkeley County. The estimate for new homes leading from 41 in Berkley County is now 18,000 units.
Myth: There are already plans in place to widen Dunes West Boulevard within the next 5 years. The “Road to Compromise” proposal provides an opportunity to further leverage already planned infrastructure improvements
Fact:
The Town of Mount Pleasant, which has jurisdiction over Dunes West Boulevard has no immediate plans to expand the road. In fact, the widening of Dunes West Boulevard is not even included in the Town of Mount Pleasant’s long term capital improvement plan. Widening the road as future improvement as part of the “Road to Compromise” would be an additional logistical and fiscal factor that would need to be taken under consideration.
Ask Your Reps for a Safer, Cost Effective, Environmentally Concious, & Efficient Transportation Solution
Win-Wins for All Communities
Workable solutions have been discussed by neighborhood leaders from a variety of communities along Highway 41. These solutions avoid encroachment into neighborhoods, enhance historic preservation & awareness, avoid devastating environmental destruction, increase pedestrian safety, and address future high volume travel coming from Berkeley County. Click here to read about one such proposal and dialogue.
Additional Resources
Representative Landing's Response Here
Read The County's Response to DES
Read The County's Response to the USACE
Read Responses from the 2023 Town of Mount Pleasant Candidate Survey on Highway 41
Park West Community Official HWY 41 Survey
Highway 41 County Council "road to compromise" Powerpoint Download
Read Responses from the 2021 Candidates for Town of Mount Pleasant Council on The Subject
Our contact form is sent to local leaders:
Charleston County Hwy 41 Project Team: hwy41sc@gmail.com 843-972-4403
Charleston County Councilmen
District 1 Herb Sass: hsass@charlestoncounty.org 843-693-8305
District 2 Larry Kobrovsky LKobrovsky@CharlestonCounty.org (843) 955-8143
District 3 Robert L. Wehrman 843)958-4030 (O) rlwehrman@charlestoncounty.org
District 4 Henry E. Darby (843)901-6793 (C) henrydarby@msn.com
District 5 Teddie E. Pryor, Sr. (843)958-4030 (O) tpryor@charlestoncounty.org
District 6 Kylon Jerome Middleton (843)325-4577 (C) kmiddleton@charlestoncounty.org
District 7 C. Brantley Moody (843)270-2483 (C) bmoody@charlestoncounty.org
District 8 Joe Boykin JBoykin@CharlestonCounty.org (843) 214-0337
District 9 Jenny Costa Honeycutt 843 -693-6447 jhoneycutt@charlestoncounty.org
Town of Mount Pleasant Council
Mayor Will Haynie bashe@tompsc.com (843) 884-8517
Howard R. Chapman, P.E. councilclk@tompsc.com
Brenda Corley councilclk@tompsc.com
John Iacofano councilclk@tompsc.com
Carl Ritchie councilclk@tompsc.com
Laura Hyatt councilclk@tompsc.com
Jake Rambo councilclk@tompsc.com
Gary Santos councilclk@tompsc.com
Guang Ming Whitley councilclk@tompsc.com
Senator Larry Grooms: LarryGrooms@scsenate.gov
State Representative Mark Smith – MarkSmith@schouse.gov
State Representative Kathy Landing: KathyLanding@SCHouse.gov (803) 212-6975
State Representative District 112 Charleston County Joe Bustos: JoeBustos@schouse.gov